Page 226 of 255

Re: CBD & South East Light Rail

Posted: Wed Mar 03, 2021 3:25 pm
by J_Busworth
I’m pretty sure that most trips on both lines are now timetabled for between 32 and 34 minutes, with 33 being most common.

This hasn’t stopped the trips from usually ballooning out to over 35 minutes on most occasions

Re: CBD & South East Light Rail

Posted: Wed Mar 03, 2021 3:59 pm
by Swift
boronia wrote: Wed Mar 03, 2021 3:21 pm I notice from TripView that the L3 is now timetabled at 33 minutes CQ to Juniors. But looking at RTD, nearly all services are predicted to be at least 5 minutes late arriving, even one hour or 2 ahead. And that is on top of accumulated previous delays.
So some are achieving 33 minutes? Considering there was talk that the intention would be no less than 40 minutes a year ago, that's good news. Hopefully keeping to that time will be the next step.
Are they still insisting on opening all doors automatically? Any talk of reinstating individual door operation?

Re: CBD & South East Light Rail

Posted: Wed Mar 03, 2021 4:25 pm
by boronia
Drivers are still opening and closing the doors, but I've noticed that if there is a delay, say, waiting for traffic lights a short distance ahead, the doors are left in manual mode until the tram is ready to move off. Late-comers can push the button to get on.

Re: CBD & South East Light Rail

Posted: Wed Mar 03, 2021 6:57 pm
by Jurassic_Joke
Really funny you mention that Boronia because I noticed that today too, QVB - they closed the doors, left in manual for a while, someone else was running (power walking) to the tram, the driver didn’t open all doors for them automatically but rather turned pointed to the flashing door button.

Passenger pressed it, said thanks, door closed again a second later. See, that wasn’t so bad hey?

That’s nice, I don’t like to read too much into things but if it’s a brief foreshadow they want to remind people of the functionality plus it makes a full comeback sometime later that would be very welcome, because I found the aircon quite lacking this past summer on the trams. Summer 2019-2020 with manual doors it was perfect.

There was also another night recently where it was very late one or the last services at Moore Park, opposite the service I was on, no one on the platform or that tram and driver didn’t bother opening them all automatically (manual mode instead).

I just wonder why at the termini stops they insist on leaving all of them open (and that’s definitely not a Corona thing, they did that before the pandemic too as far as I remember)

Re: CBD & South East Light Rail

Posted: Wed Mar 03, 2021 7:44 pm
by Swift
Just bring it back already. People have to touch other surfaces anyway. Surely there are controls out there that can be triggered with the wave of a palm if they're that hysterical over push button doors?
It's proven to save energy and isn't that what all agencies-strive to be doing?

Re: CBD & South East Light Rail

Posted: Thu Mar 04, 2021 2:16 pm
by jpp42
"Track issues" near Bridge St have led to disruptions today - all trams cancelled north of Central for a while with limited service now resuming as far as Town Hall.

Re: CBD & South East Light Rail

Posted: Thu Mar 04, 2021 3:36 pm
by boronia
Qantas94Heavy wrote: Tue Mar 02, 2021 5:49 pm When did they remove the traffic lights near the Surry Hills stop? Must have been in the last week or two unless I was particularly inattentive. Now traffic cannot travel through Marlborough St to Devonshire St and vice versa.
On second thought, the only lights near the SH stop are those just east of the stop? On checking today, they are still there.

Re: CBD & South East Light Rail

Posted: Sun Mar 07, 2021 10:53 am
by boronia

Re: CBD & South East Light Rail

Posted: Sun Mar 07, 2021 12:46 pm
by tonyp
boronia wrote: Sun Mar 07, 2021 10:53 am Emergency exercise:

https://www.youtube.com/watch?v=tQ0UvnD5N9M
They had a real-life such incident in Haymarket with a Variotram a few years ago. Of course, they jacked up the front of the tram.

Re: CBD & South East Light Rail

Posted: Sun Mar 07, 2021 3:44 pm
by Swift
I thought I saw a decoupled tram yesterday morning as I drove past the Kingsford stop early yesterday morning just past 7am. I didn't take enough notice of it until I had already driven past. I was looking at the destination.
It was one of those moments where I thought hang on a moment.

Re: CBD & South East Light Rail

Posted: Mon Mar 08, 2021 11:15 am
by marcnut1996
boronia wrote: Thu Mar 04, 2021 3:36 pm
Qantas94Heavy wrote: Tue Mar 02, 2021 5:49 pm When did they remove the traffic lights near the Surry Hills stop? Must have been in the last week or two unless I was particularly inattentive. Now traffic cannot travel through Marlborough St to Devonshire St and vice versa.
On second thought, the only lights near the SH stop are those just east of the stop? On checking today, they are still there.
See https://www.rms.nsw.gov.au/projects/01d ... 021-02.pdf regarding the removal of traffic lights.

Re: CBD & South East Light Rail

Posted: Mon Mar 08, 2021 11:44 am
by boronia
OK, looks like just pedestrian crossing lights there now to hold up the trams.

Re: CBD & South East Light Rail

Posted: Mon Mar 08, 2021 11:48 am
by marcnut1996
I have mentioned this about the closure of Thomas Street from Sussex Street in the IWRL thread, but the pedestrian plaza along George Street and Devonshire Street (between Chalmers and Elizabeth) was endorsed by Council's traffic committee recently in November and endorsed by the Councillors in December.

Traffic Committee (George): https://meetings.cityofsydney.nsw.gov.a ... px?Id=2495 - Link to drawings at bottom of the page.
Traffic Committee (Devonshire): https://meetings.cityofsydney.nsw.gov.a ... px?Id=2496 - Link to drawings at bottom of the page.
Council meeting: https://meetings.cityofsydney.nsw.gov.a ... il.pdf?T=1

In summary:
*Footpath widened to the light rail tracks
*George Street narrowed to one lane per direction between Rawson Pl and Railway Square - with a raised pedestrian crossing across George Street at Railway Square

Re: CBD & South East Light Rail

Posted: Mon Mar 08, 2021 1:08 pm
by Swift
So I guess by the absence of acknowledgements I was wrong on thinking I may have passed a single set?

Re: CBD & South East Light Rail

Posted: Mon Mar 08, 2021 2:37 pm
by Fleet Lists
Not necessarily.

Re: CBD & South East Light Rail

Posted: Mon Mar 08, 2021 3:44 pm
by Swift
So I might have seen a single unit?

Just found this Seven News report.
https://youtu.be/tQ0UvnD5N9M

Re: CBD & South East Light Rail

Posted: Mon Mar 08, 2021 4:33 pm
by boronia
That looks like taken at Platform 3 Chalmers St.

Re: CBD & South East Light Rail

Posted: Mon Mar 08, 2021 5:26 pm
by marcnut1996
marcnut1996 wrote: Mon Mar 08, 2021 11:48 am I have mentioned this about the closure of Thomas Street from Sussex Street in the IWRL thread, but the pedestrian plaza along George Street and Devonshire Street (between Chalmers and Elizabeth) was endorsed by Council's traffic committee recently in November and endorsed by the Councillors in December.

Traffic Committee (George): https://meetings.cityofsydney.nsw.gov.a ... px?Id=2495 - Link to drawings at bottom of the page.
Traffic Committee (Devonshire): https://meetings.cityofsydney.nsw.gov.a ... px?Id=2496 - Link to drawings at bottom of the page.
Council meeting: https://meetings.cityofsydney.nsw.gov.a ... il.pdf?T=1

In summary:
*Footpath widened to the light rail tracks
*George Street narrowed to one lane per direction between Rawson Pl and Railway Square - with a raised pedestrian crossing across George Street at Railway Square
Further to my previous post, works still start this month.
https://www.cityofsydney.nsw.gov.au/imp ... blic-space

Re: CBD & South East Light Rail

Posted: Mon Mar 08, 2021 5:28 pm
by Scott4570
In the YouTube clip mentioned above, at about the 53 seconds mark, they pull the dummy body out from underneath the tram, and you can see a 2nd unit behind. That looks like the full length of the Platform.

Central Platform 3 with the Bike Lanes beside.

Re: CBD & South East Light Rail

Posted: Wed Mar 10, 2021 12:02 pm
by boronia
Maybe why they need some rescue drills:
https://www.dailymail.co.uk/news/articl ... ydney.html

Re: CBD & South East Light Rail

Posted: Wed Mar 10, 2021 3:39 pm
by Swift
Had to happen.

Re: CBD & South East Light Rail

Posted: Thu Mar 11, 2021 12:24 am
by Jurassic_Joke
Could instantly recognise the sets in question as trams 001+002. 001 has been carrying the Xero adwrap for a while, perhaps one of the very few adwraps I don’t mind because it happens to be my favourite shade of blue.

But back to actual topic, that is pretty appalling to see. Could’ve had some very nasty consequences..

Re: CBD & South East Light Rail

Posted: Thu Mar 11, 2021 1:09 am
by Swift
You can imagine all the do gooders offering him comfort as they try to rescue him from underneath, much like that incident on T1 years ago where a pedestrian didn't exercise due care crossing.
This was far worse and disgusting to see.

Re: CBD & South East Light Rail

Posted: Sat Mar 13, 2021 6:25 pm
by boronia
Another car vs tram accident at South Dowling St this afternoon.

RTD seems all screwed up. A lot of services "cancelled" or "added".

Re: CBD & South East Light Rail

Posted: Thu Mar 18, 2021 7:17 pm
by boronia
Service Alert at 17:15 that L2/L3 suspended for rest of night due to OH Wire repairs at Moore Park.