Yeronga Station Closure.

Brisbane / QLD Transport Discussion

Moderator: PRT 065

Post Reply
User avatar
superbossgc
Posts: 2163
Joined: Thu Apr 20, 2006 2:11 pm

Yeronga Station Closure.

Post by superbossgc »

https://translink.com.au/yerongastationclosure

6 month closure of Yeronga station due of the construction from late April, Rail bus shuttle will be number 109 between Moorooka and Boggo busway stations.
Austral Volvo B10M mk3 Artic (375-380) 1991-2012
User avatar
superbossgc
Posts: 2163
Joined: Thu Apr 20, 2006 2:11 pm

Re: Yeronga Station Closure.

Post by superbossgc »

Closures commencing 19th April 2021 for 6 months.

https://crossriverrail.qld.gov.au/const ... 5iC13Huxr4

109 stationlink service is to start run between Moorooka and Boggo busways from that date.

Here the Timetable flyers (this link is access to PDF). https://translink.com.au/sites/default/ ... 210419.pdf
Austral Volvo B10M mk3 Artic (375-380) 1991-2012
User avatar
ABS
Posts: 2370
Joined: Sat Oct 01, 2005 1:59 am
Location: 6 months too late

Re: Yeronga Station Closure.

Post by ABS »

New timetable is useless not having timing points at each station.
^^__^^
Posts: 187
Joined: Thu Jul 26, 2012 6:06 pm
Favourite Vehicle: S1989 - Live well poppin' tags
Location: Brisbane

Re: Yeronga Station Closure.

Post by ^^__^^ »

ABS wrote: Fri Mar 26, 2021 12:32 pm New timetable is useless not having timing points at each station.
The trains won't be running at the stations in between, express from Boggo Rd to Moorooka.

No need for timing points at these stations if they aren't connecting to any trains.
Cazza
Posts: 310
Joined: Thu Jan 31, 2019 6:26 pm
Location: Brisbane

Re: Yeronga Station Closure.

Post by Cazza »

The bus timetable ABS means. I have already sent TransLink that feedback saying it's a pretty big slap in the face making commuters have to guess when their bus will arrive, only judging by the start departure time and a diagrammatic map. I would encourage others to do the same if they have the time.
User avatar
superbossgc
Posts: 2163
Joined: Thu Apr 20, 2006 2:11 pm

Re: Yeronga Station Closure.

Post by superbossgc »

today is 1 week left until closure, yes you can have a photo of those station before late sunday night.
Austral Volvo B10M mk3 Artic (375-380) 1991-2012
daveeyh
Posts: 1451
Joined: Mon Mar 08, 2004 1:20 pm
Location: Brisbane

Re: Yeronga Station Closure.

Post by daveeyh »

^^__^^ wrote: Fri Mar 26, 2021 1:34 pm
ABS wrote: Fri Mar 26, 2021 12:32 pm New timetable is useless not having timing points at each station.
The trains won't be running at the stations in between, express from Boggo Rd to Moorooka.

No need for timing points at these stations if they aren't connecting to any trains.
The trains are not running express from Park Road to Moorooka. It is only Yeronga Station that is being missed at this point in time but this is likely to change in the future.

Having the 109 service running from Boggo Road to Moorooka from the start means that the timetable does not need to be changed every time a new closure is announced during the CRR construction.