Re: Wulkuraka Maintenance Centre

Postby nathan1987 » Thu Sep 20, 2018 7:00 pm

What lines are the NGR currently servicing? I knew the Gold Coast was first. So many are being delivered but how many are in service and what lines.
nathan1987
 
Posts: 211
Joined: Sun Apr 10, 2011 5:31 pm
Has thanked: 2 times
Been thanked: 4 times

Re: Wulkuraka Maintenance Centre

Postby 1of55 » Thu Sep 20, 2018 10:34 pm

NGR trains are currently in service on the Airport/ Gold Coast lines, Doomben line and Redcliffe and Springfield lines. The most numerous NGR trains are on the Gold Coast/ Airport lines. They all run through the central stations as all the lines pass through. The Doomben trains often terminate at Roma Street, but they are not all NGR. The Springfield and Redcliffe lines tend to run some NGR trains at morning and afternoon peaks and can terminate at Bowen Hills. EMUs and SMUs other times.
I do not have figures for the number in service; it is increasing all the time. The NGR trains also travel on the Ipswich/ Rosewood line as test trains to and from Wulkuraka Maintenance Centre.
701, 702 and a damaged 715 can be seen from Redbank Station.
1of55
 
Posts: 155
Joined: Fri Feb 01, 2013 9:08 pm
Has thanked: 11 times
Been thanked: 38 times

Re: Wulkuraka Maintenance Centre

Postby Swift » Fri Sep 21, 2018 1:19 pm

Any particular reason Queensland chose narrow gauge instead of a wider system? They look like the sugar cane tracks to the north. I wonder what the gauge of Gold Coast Light Rail is. They look to be standard gauge.
QR Citytrain need to go dual gauge so as they can phase in standard gauge rolling stock in the future.
Sydney's single decker future.
User avatar
Swift
 
Posts: 10373
Joined: Sat Mar 06, 2004 12:23 pm
Location: Ettalong- the world capital of 0405s.
Has thanked: 644 times
Been thanked: 534 times
Favourite Vehicle: Porshe 911 Carerra

Re: Wulkuraka Maintenance Centre

Postby 1of55 » Fri Sep 21, 2018 9:19 pm

Queensland choose 3’6” gauge when Australia was a country of separate colonies and joining of the separate rail systems was not contemplated, as the settlements were thousands of miles apart and the lines were constructed to ferry goods and produce to the ports. Narrow gauge was selected as it was cheaper to construct and the lines also followed the contours of the land and avoided tunnels and earthworks to lower costs. We do have dual gauge into the Port of Brisbane, Acacia Ridge and Roma Street for the interstate train to Sydney. I can’t see conversion to standard gauge of the entire system ever happening as the cost would be uneconomic, so that is why we have Bombardier NGR trains with narrow gauge bogies. On the new extensions the track is built much straighter and the narrower gauge is not a problem as the trains can safely travel at 140klm. The Gold Coast tram is 4’8½” gauge.
1of55
 
Posts: 155
Joined: Fri Feb 01, 2013 9:08 pm
Has thanked: 11 times
Been thanked: 38 times

Re: Wulkuraka Maintenance Centre

Postby nathan1987 » Sat Sep 22, 2018 11:03 am

1of55 wrote:NGR trains are currently in service on the Airport/ Gold Coast lines, Doomben line and Redcliffe and Springfield lines. The most numerous NGR trains are on the Gold Coast/ Airport lines. They all run through the central stations as all the lines pass through. The Doomben trains often terminate at Roma Street, but they are not all NGR. The Springfield and Redcliffe lines tend to run some NGR trains at morning and afternoon peaks and can terminate at Bowen Hills. EMUs and SMUs other times.
I do not have figures for the number in service; it is increasing all the time. The NGR trains also travel on the Ipswich/ Rosewood line as test trains to and from Wulkuraka Maintenance Centre.
701, 702 and a damaged 715 can be seen from Redbank Station.



Thanks for that, hopefully they will be on all line soon including the Sunshine Coast Line, because every time I am up there that particular Gympie North ICE service is always cancelled or delayed due to mechanical faults.
nathan1987
 
Posts: 211
Joined: Sun Apr 10, 2011 5:31 pm
Has thanked: 2 times
Been thanked: 4 times

Re: Wulkuraka Maintenance Centre

Postby 1of55 » Sat Oct 20, 2018 5:50 pm

NGR736ParkRoad20Oct2018.JPG
NGR 736 at Park Road ready to depart for Domben.
NGR736ParkRoad20Oct2018.JPG (291.82 KiB) Viewed 11144 times
NGR 736 at Park Road ready to depart for Domben. 737 also seen in service on Gold Coast line.
1of55
 
Posts: 155
Joined: Fri Feb 01, 2013 9:08 pm
Has thanked: 11 times
Been thanked: 38 times

Re: Wulkuraka Maintenance Centre

Postby 1of55 » Sun Nov 25, 2018 2:36 pm

740 and 741 in service on GoldCoaast line.
1of55
 
Posts: 155
Joined: Fri Feb 01, 2013 9:08 pm
Has thanked: 11 times
Been thanked: 38 times

Re: Wulkuraka Maintenance Centre

Postby Swift » Sun Nov 25, 2018 4:08 pm

Must confess, their aerodynamic noses have grown on me. I just hope their interiors reflect their futuristic looks on the the outside and their doors open and shut fast in the traditional way. :)
Sydney's single decker future.
User avatar
Swift
 
Posts: 10373
Joined: Sat Mar 06, 2004 12:23 pm
Location: Ettalong- the world capital of 0405s.
Has thanked: 644 times
Been thanked: 534 times
Favourite Vehicle: Porshe 911 Carerra

Re: Wulkuraka Maintenance Centre

Postby 1of55 » Sun Dec 02, 2018 12:32 pm

NGR trains have been in service on the Ipswich- Caboolture line since Oct 22. Here is NGR 738 at Ipswich station 29 Nov. The trains get switched around between lines seen NGR 738 Saturday on the Gold Coast line.
All the NGR trains I ve seen in service have 1 on board toilet, situated mid train. As we are now over half way into the total order of 75 trains, and an earlier announcement was made * that only the Interurban fleet—35 trains with 2 toilet modules (in the middle 2 cars) for longer distance services be fitted with an on board toilet and Suburban fleet—40 trains with no toilets for shorter distance services would be in service with no toilet, I assume that some are to be modified post delivery and the removed parts used for spares.
* https://www.tmr.qld.gov.au/Projects/Nam ... NGR-trains
Attachments
NGR738Ipswich29Nov2018.JPG
NGR738Ipswich29Nov2018.JPG (266.6 KiB) Viewed 8806 times
1of55
 
Posts: 155
Joined: Fri Feb 01, 2013 9:08 pm
Has thanked: 11 times
Been thanked: 38 times

Re: Wulkuraka Maintenance Centre

Postby 1of55 » Fri Dec 07, 2018 9:24 pm

NGR 702 has gone from Redbank but 701 and 715 remain.
Attachments
NGR701715Redbank7dec2918.JPG
NGR701715Redbank7dec2918.JPG (227.56 KiB) Viewed 8451 times
1of55
 
Posts: 155
Joined: Fri Feb 01, 2013 9:08 pm
Has thanked: 11 times
Been thanked: 38 times

Re: Wulkuraka Maintenance Centre

Postby 1of55 » Thu Jan 10, 2019 7:07 pm

interior shot of NGR 747 at Ipswich. NGR 748 also seen in service on Gold Coast line.
Attachments
NGR747Ipswich10jan2019.JPG
NGR747Ipswich10jan2019.JPG (261.16 KiB) Viewed 7477 times
1of55
 
Posts: 155
Joined: Fri Feb 01, 2013 9:08 pm
Has thanked: 11 times
Been thanked: 38 times

Re: Wulkuraka Maintenance Centre

Postby 1of55 » Mon Jan 21, 2019 12:13 pm

NGR 701 has arrived back at the WMC towed behind diesel locos from Redbank.
1of55
 
Posts: 155
Joined: Fri Feb 01, 2013 9:08 pm
Has thanked: 11 times
Been thanked: 38 times

Re: Wulkuraka Maintenance Centre

Postby 1of55 » Fri Feb 22, 2019 11:56 am

NGR 715 (the damaged train) has gone from Redbank.
1of55
 
Posts: 155
Joined: Fri Feb 01, 2013 9:08 pm
Has thanked: 11 times
Been thanked: 38 times

Re: Wulkuraka Maintenance Centre

Postby 1of55 » Wed Apr 24, 2019 7:41 pm

NGR 728 doing test train runs on the wrong road past the WMC. The line carries a lot of traffic, coal trains, some wheat trains and a passenger service. Some times the tracks have to be used in either direction. NGR 758 has been seen in test runs so they are well into the order for 75 6 car units.
Attachments
NGR728testrun2342019.JPG
NGR728testrun2342019.JPG (281 KiB) Viewed 4127 times
1of55
 
Posts: 155
Joined: Fri Feb 01, 2013 9:08 pm
Has thanked: 11 times
Been thanked: 38 times

Re: Wulkuraka Maintenance Centre

Postby 1of55 » Mon Apr 29, 2019 11:30 am

NGR 761 and 762 have just arrived at WMC coupled together behind 2 QR diesels.
1of55
 
Posts: 155
Joined: Fri Feb 01, 2013 9:08 pm
Has thanked: 11 times
Been thanked: 38 times

Re: Wulkuraka Maintenance Centre

Postby 1of55 » Wed May 15, 2019 6:33 pm

NGR 756 seen in service on Gold Coast line. NGR 702 is in decorative wrap like 704, 705, 706, and doing test train runs. NGR 701 has been at Maryborough for modifications since late January.
1of55
 
Posts: 155
Joined: Fri Feb 01, 2013 9:08 pm
Has thanked: 11 times
Been thanked: 38 times

Re: Wulkuraka Maintenance Centre

Postby Swift » Wed May 15, 2019 9:17 pm

Definitely growing on me this new QR Citytrain stock :lol: . I really admire the quick shutting doors. Can you imagine NSW adopting such a common sense idea? We are only now re-adopting the radical idea that single decks work better for high turnover work. :roll:
Sydney's single decker future.
User avatar
Swift
 
Posts: 10373
Joined: Sat Mar 06, 2004 12:23 pm
Location: Ettalong- the world capital of 0405s.
Has thanked: 644 times
Been thanked: 534 times
Favourite Vehicle: Porshe 911 Carerra

Re: Wulkuraka Maintenance Centre

Postby 1of55 » Fri May 24, 2019 12:45 pm

NGR 763 and NGR 764 have arrived today at the WMC coupled together behind diesel locos. NGR 758 seen in service.
1of55
 
Posts: 155
Joined: Fri Feb 01, 2013 9:08 pm
Has thanked: 11 times
Been thanked: 38 times

Re: Wulkuraka Maintenance Centre

Postby 1of55 » Sun Jun 16, 2019 6:30 pm

NGR702 one of the early deliveries and at Progress rail sidings for a while, now with decorative wrap like 704, 705, 706, going at slow speed through the automatic train inspection building at WMC.
Attachments
NGR702wulk16062019.JPG
NGR702wulk16062019.JPG (240.51 KiB) Viewed 1545 times
1of55
 
Posts: 155
Joined: Fri Feb 01, 2013 9:08 pm
Has thanked: 11 times
Been thanked: 38 times

Re: Wulkuraka Maintenance Centre

Postby Swift » Sun Jun 16, 2019 11:22 pm

Aboriginal art plastered on transport is so cliche now. Can't we come up with a different cringey fad now?
Sydney's single decker future.
User avatar
Swift
 
Posts: 10373
Joined: Sat Mar 06, 2004 12:23 pm
Location: Ettalong- the world capital of 0405s.
Has thanked: 644 times
Been thanked: 534 times
Favourite Vehicle: Porshe 911 Carerra

Re: Wulkuraka Maintenance Centre

Postby Cazza » Mon Jun 17, 2019 12:11 am

To their credit, they didn't cover the windows in the wrap so I don't really have a problem with it. And I do think it looks kinda funky and as it's only been applied to a few of the sets, it's fairly unique. But I can see what you mean.
New STA Network: https://bit.ly/2F386Ui
Cazza
 
Posts: 61
Joined: Thu Jan 31, 2019 5:26 pm
Location: Brisbane
Has thanked: 11 times
Been thanked: 21 times

Re: Wulkuraka Maintenance Centre

Postby Swift » Mon Jun 17, 2019 7:25 pm

It looks XXX. Good to see NSW isn't the only place with mediocrity like this.
Sydney's single decker future.
User avatar
Swift
 
Posts: 10373
Joined: Sat Mar 06, 2004 12:23 pm
Location: Ettalong- the world capital of 0405s.
Has thanked: 644 times
Been thanked: 534 times
Favourite Vehicle: Porshe 911 Carerra