With the Adelaide-Salisbury electrification expected to take place during the next couple of years, is there a chance we'll see some withdrawn (from regular service) SL202s on rail sub runs between Adelaide and Salisbury? I'm just curious.
- Lt. Commander Data
- Posts: 2327
- Joined: Thu Feb 27, 2014 9:09 am
- Favourite Vehicle: Scania L94UB
- Location: Adelaide Hills
Re: Question regarding rail closures
You'd think that all the ex- rail sub CB80s would be rail subs again, instead of the SL 202s
First person on 822, 865 (2016 re-route).
Last person on 164, 867, 868
Last person on 164, 867, 868
Re: Question regarding rail closures
There is still over 30 MAN SG280 Artics stored at Elizabeth Depot,that can be reinstated for use as rail subs if the electrification does proceed?
-
- Posts: 1987
- Joined: Wed Mar 10, 2004 6:01 pm
- Favourite Vehicle: 1640. In service - 1738
- Location: Earth's Scania capital
Re: Question regarding rail closures
I would've thought that the SGs would reached their age limit even for rail sub use by then. When was the last time a 29-31 year old bus saw use on an Admet run?
Nonetheless, though, it'd be nice to catch them again, especially the ones with ZFs. I do miss 2364 and 2367 a little bit.
Nonetheless, though, it'd be nice to catch them again, especially the ones with ZFs. I do miss 2364 and 2367 a little bit.
- Tonsley213
- Posts: 331
- Joined: Sun Jun 21, 2009 5:45 pm
- Favourite Vehicle: Scania
Re: Question regarding rail closures
One would hope they electrify the line with out weekday closures.
- The Phonj
- Administrator
- Posts: 2874
- Joined: Sat Mar 06, 2004 11:09 pm
- Favourite Vehicle: MAN SL202, PMCSA body
- Location: Somewhere in suburban Adelaide
- Contact:
Re: Question regarding rail closures
With the "Torrens to Torrens" South Rd project involving the elevation of the Outer Harbor/Grange railway over South Rd (fact sheet link: http://www.infrastructure.sa.gov.au/__d ... y_2014.pdf) those lines may be looking at upcoming closures to accommodate the project.
Bus Preservation Association of South Australia https://www.bpasa.org.au/
Tramway Museum St. Kilda https://www.trammuseumadelaide.com/
National Railway Museum, Port Adelaide https://nrm.org.au/
Tramway Museum St. Kilda https://www.trammuseumadelaide.com/
National Railway Museum, Port Adelaide https://nrm.org.au/
-
- Posts: 147
- Joined: Fri May 30, 2014 5:13 pm
- Favourite Vehicle: Any low floor bus
Re: Question regarding rail closures
A temporary bypass single rail track will be able to operate during construction, resulting in only minor service disruptions over a six to nine month construction timeframe.
-
- Posts: 621
- Joined: Tue May 25, 2010 1:42 pm
- Favourite Vehicle: XPT
- Location: Adelaide Parklands Terminal
Re: Question regarding rail closures
With a temporary level crossing?I Follow PAFC wrote:A temporary bypass single rail track will be able to operate during construction, resulting in only minor service disruptions over a six to nine month construction timeframe.
Next station is Victoria Square. Change here for all trains.
-
- Posts: 147
- Joined: Fri May 30, 2014 5:13 pm
- Favourite Vehicle: Any low floor bus
Re: Question regarding rail closures
That is in http://www.infrastructure.sa.gov.au/__d ... y_2014.pdf so not sure.Eurostar wrote:With a temporary level crossing?I Follow PAFC wrote:A temporary bypass single rail track will be able to operate during construction, resulting in only minor service disruptions over a six to nine month construction timeframe.
-
- Posts: 621
- Joined: Tue May 25, 2010 1:42 pm
- Favourite Vehicle: XPT
- Location: Adelaide Parklands Terminal
Re: Question regarding rail closures
With a temporary level crossing?[/quote]
That is in http://www.infrastructure.sa.gov.au/__d ... y_2014.pdf so not sure.[/quote]
With 6 trains outbound and 5 trains inbound between 5pm and 6pm combined with vehicles it could get messy
That is in http://www.infrastructure.sa.gov.au/__d ... y_2014.pdf so not sure.[/quote]
With 6 trains outbound and 5 trains inbound between 5pm and 6pm combined with vehicles it could get messy
Next station is Victoria Square. Change here for all trains.
-
- Posts: 147
- Joined: Fri May 30, 2014 5:13 pm
- Favourite Vehicle: Any low floor bus
Re: Question regarding rail closures
Maybe there will be no Grange train with the Outer Harbor train been 30mins and not 15mins.
- The Phonj
- Administrator
- Posts: 2874
- Joined: Sat Mar 06, 2004 11:09 pm
- Favourite Vehicle: MAN SL202, PMCSA body
- Location: Somewhere in suburban Adelaide
- Contact:
Re: Question regarding rail closures
I have trouble contemplating how a road can be lowered under a new rail bridge while the road is still in use and a temporary bypass track (which won't be that far from the new bridge) has a level crossing on the same road.
Bus Preservation Association of South Australia https://www.bpasa.org.au/
Tramway Museum St. Kilda https://www.trammuseumadelaide.com/
National Railway Museum, Port Adelaide https://nrm.org.au/
Tramway Museum St. Kilda https://www.trammuseumadelaide.com/
National Railway Museum, Port Adelaide https://nrm.org.au/
-
- Posts: 621
- Joined: Tue May 25, 2010 1:42 pm
- Favourite Vehicle: XPT
- Location: Adelaide Parklands Terminal
Re: Question regarding rail closures
IMO the South roads will need be lowered first then the railway put over the new roads. I don't see how a temporary railway would work without being disruptive to the rest of the projectThe Phonj wrote:I have trouble contemplating how a road can be lowered under a new rail bridge while the road is still in use and a temporary bypass track (which won't be that far from the new bridge) has a level crossing on the same road.
Next station is Victoria Square. Change here for all trains.
Re: Question regarding rail closures
According to the artist's impression in the factsheet there will be eventually be 10 lanes of roadway under the rail bridge plus reservations for the piers. Because of the substation most of the road formation will be to the east of the existing alignment. The excavation of the surface roads will presumably be c. 1-2m. The temporary rail track will most likely be on the south side of the existing rail line and could be located to avoid too much of a climb to/from the excavated section. It should be possible to accomodate 4 lanes of roadway through the bridge location while it is constructed. Partial excavation of the underpass lanes could take place before the bridge spans are installed and rail established over the bridge.Eurostar wrote:IMO the South roads will need be lowered first then the railway put over the new roads. I don't see how a temporary railway would work without being disruptive to the rest of the projectThe Phonj wrote:I have trouble contemplating how a road can be lowered under a new rail bridge while the road is still in use and a temporary bypass track (which won't be that far from the new bridge) has a level crossing on the same road.
In many ways the project is similar to the Gallipoli underpass & tram overpass which was accomplished with staged work while maintaining traffic flows. Traffic also may be encouraged to take alternative routes such as James Congdon Drive which will be duplicated between South and Sir Donald Bradman.
- jarf
- Posts: 1361
- Joined: Sat Feb 05, 2005 4:24 pm
- Favourite Vehicle: Scania L94UA/Volgren CR228L
- Location: Stab Albans
- Contact:
Re: Question regarding rail closures
It gets tricky, but it can be done.The Phonj wrote:I have trouble contemplating how a road can be lowered under a new rail bridge while the road is still in use and a temporary bypass track (which won't be that far from the new bridge) has a level crossing on the same road.
The easiest way is generally to temporarily divert the road to one side, assemble the rail bridge on the old road alignment, and then move it into place during a rail shutdown and then dig out around it. (Try Googling Taylors Road or Anderson Road in Melbourne for examples)
It's certainly a little more complicated because the rail line is going to be raised slightly as well. Although it wouldn't be impossible to also include a temporary rail line diversion, depending on the amount of space that's available.