Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by rogf24 »

Another Brit, no wonder TfNSW and subsidiaries are bereft of ideas.
neilrex
Posts: 697
Joined: Thu Jun 16, 2016 8:34 pm

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by neilrex »

Yet from what I read in "The Guardian" online, public transport in Manchester, and the north of England generally, has become a complete shambles, it's getting worse and no improvement in sight.
User avatar
rogf24
Posts: 1186
Joined: Thu May 09, 2013 4:20 pm

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by rogf24 »

That might have to do with the new train timetable introduced earlier this year? Thousands of new services each week but it all came tumbling down, from the looks of it much, much worse than Sydney experienced in January.
Transtopic
Posts: 1490
Joined: Fri Nov 25, 2011 10:10 pm

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by Transtopic »

rogf24 wrote:Another Brit, no wonder TfNSW and subsidiaries are bereft of ideas.
Obviously attempting to expunge any last vestiges of management of the legacy rail network from the transport bureaucracy. Local knowledge seems to be a low priority nowadays. I'd be happier if it was someone with European experience, rather than just another pom. There are too many already.
lunchbox
Posts: 1796
Joined: Sun Jan 14, 2007 4:50 pm
Favourite Vehicle: Bicycle - no waiting - on time
Location: Sydney

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by lunchbox »

This new appointment seems to have overshadowed the departure of Tony Braxton-Smith, director of whatever at TfNSW, to South Australia. He came and went with an impressive CV, but I'm personally very disattisfied with his record at TfNSW.
Transtopic
Posts: 1490
Joined: Fri Nov 25, 2011 10:10 pm

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by Transtopic »

lunchbox wrote:This new appointment seems to have overshadowed the departure of Tony Braxton-Smith, director of whatever at TfNSW, to South Australia. He came and went with an impressive CV, but I'm personally very disattisfied with his record at TfNSW.
Care to elaborate?
lunchbox
Posts: 1796
Joined: Sun Jan 14, 2007 4:50 pm
Favourite Vehicle: Bicycle - no waiting - on time
Location: Sydney

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by lunchbox »

I won't elaborate because I am not privy to the internal workings of Transport for NSW. I remain convinced that many of the policies and decisions out of TfNSW have not been in the interests of the travelling public. I CAN confirm that each of them which has concerned me has been discussed in this forum.
User avatar
rogf24
Posts: 1186
Joined: Thu May 09, 2013 4:20 pm

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by rogf24 »

The thing is, not everything you complain about concerns everyone, not even the majority of the travelling public or the majority along the road/route. I'm sure there are many things he could have done better but your complaints ≠ travelling public.
Engineering
Posts: 83
Joined: Mon Jan 20, 2014 8:48 pm

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by Engineering »

Work commenced at Chatswood station for conversion to metro

Platform 3 already boarded off (approx 2/3 of platform width remaining for platform 4 passengers) on the western island.

Platform 2 signs and electronic destination screens removed on platform 2 on the esastern island.
moa999
Posts: 2923
Joined: Fri Nov 23, 2012 3:12 pm

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by moa999 »

Wouldve thought you'd use the same screens, just connected to a new system.

Assume they'll get the Chatswood PSDs up quickly - give back the platform space.. and show progress.

Be more interested to see how much work needs to go into track height adjustment.
gld59
Posts: 1432
Joined: Tue Jun 05, 2007 6:30 pm
Location: Canberra

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by gld59 »

Is that the sort of thing where they need a mass concrete trackbed, or would they stay with stone ballast?
User avatar
boronia
Posts: 21567
Joined: Sat Mar 06, 2004 6:18 am
Favourite Vehicle: Ahrens Fox; GMC PD4107
Location: Sydney NSW

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by boronia »

Some preliminary work for the PSDs has been visible on Chatswood 2 and 3 for a while.

The platform tracks are on mass concrete bases.
Preserving fire service history
@ The Museum of Fire.
grog
Posts: 614
Joined: Wed Nov 07, 2007 8:09 am
Location: Sydney

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by grog »

moa999 wrote:Wouldve thought you'd use the same screens, just connected to a new system.

Assume they'll get the Chatswood PSDs up quickly - give back the platform space.. and show progress.

Be more interested to see how much work needs to go into track height adjustment.
My understanding is that none should be needed.
User avatar
GazzaOak
Posts: 885
Joined: Thu Mar 21, 2013 9:53 pm

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by GazzaOak »

I wonder how frequent weekend trackwork will be on the north shore line because of the metro construction
White ribbon day is most sexist thing ever
Frosty
Posts: 1828
Joined: Sat Jun 27, 2015 7:16 pm

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by Frosty »

GazzaOak wrote:I wonder how frequent weekend trackwork will be on the north shore line because of the metro construction
I'm pretty sure there is page somewhere on transportnsw.info or TfNSW website showing scope of trackwork in the next 6 months in there will be your answer.
Transtopic
Posts: 1490
Joined: Fri Nov 25, 2011 10:10 pm

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by Transtopic »

grog wrote:
moa999 wrote:Wouldve thought you'd use the same screens, just connected to a new system.

Assume they'll get the Chatswood PSDs up quickly - give back the platform space.. and show progress.

Be more interested to see how much work needs to go into track height adjustment.
My understanding is that none should be needed.
Correct me if I'm wrong, but I understand the major alterations to the existing platforms on the ECRL stations will be widening to reduce the gap with the narrower profile metro trains and installation of PSDs.
User avatar
swtt
Posts: 5666
Joined: Mon Sep 21, 2009 4:49 pm

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by swtt »

Transtopic wrote: Correct me if I'm wrong, but I understand the major alterations to the existing platforms on the ECRL stations will be widening to reduce the gap with the narrower profile metro trains and installation of PSDs.
Reducing that gap can be done easily with platform gap fillers.

https://en.wikipedia.org/wiki/Platform_gap_filler
grog
Posts: 614
Joined: Wed Nov 07, 2007 8:09 am
Location: Sydney

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by grog »

The trains aren’t actually much narrower, about 10cm total and 5cm per side, and that will be easily taken care of with PSD installation. My understanding is they run on the same guage at the same platform height and same overhead voltage - upgrades for ECRL is primarily PSDs, ripping out the old signals and testing the new signal system, as well as separating the track and power supply at the interfaces.
stupid_girl
Posts: 933
Joined: Fri Sep 04, 2009 3:25 pm

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by stupid_girl »

Frosty wrote:
GazzaOak wrote:I wonder how frequent weekend trackwork will be on the north shore line because of the metro construction
I'm pretty sure there is page somewhere on transportnsw.info or TfNSW website showing scope of trackwork in the next 6 months in there will be your answer.
https://transportnsw.info/future-trackwork-calendar
I can only see the trackwork schedule up to early Dec.
mandonov
Posts: 1712
Joined: Mon Jun 03, 2013 8:34 pm

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by mandonov »

grog wrote:The trains aren’t actually much narrower, about 10cm total and 5cm per side, and that will be easily taken care of with PSD installation. My understanding is they run on the same guage at the same platform height and same overhead voltage - upgrades for ECRL is primarily PSDs, ripping out the old signals and testing the new signal system, as well as separating the track and power supply at the interfaces.
It's a shame they didn't bother with making the line 25 kV AC.
User avatar
Daniel
Administrator
Posts: 7062
Joined: Mon Jul 04, 2005 9:03 pm
Favourite Vehicle: Mercedes-Benz O405 / CC '510'
Location: Sutherland Shire

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by Daniel »

There is also adjustments to the track height to ensure level boarding at stations, modification to emergency walkways and the like.
andy_centralcoast
Posts: 819
Joined: Tue Dec 30, 2014 8:22 pm
Location: NSW

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by andy_centralcoast »

stupid_girl wrote:
Frosty wrote: I'm pretty sure there is page somewhere on transportnsw.info or TfNSW website showing scope of trackwork in the next 6 months in there will be your answer.
https://transportnsw.info/future-trackwork-calendar
I can only see the trackwork schedule up to early Dec.
That document used to show 6 months in advance, now it's only the next 2 months!

TfNSW continue their assault on customers information.
grog
Posts: 614
Joined: Wed Nov 07, 2007 8:09 am
Location: Sydney

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by grog »

Daniel wrote:There is also adjustments to the track height to ensure level boarding at stations, modification to emergency walkways and the like.
Do you have a source for this? My understanding is that this is not correct. There is no major civil work required such as changing track height. The platforms of the ECRL and Chatswood are 9 years old and should all be at an appropriate height for level boarding.

When they move on to the Bankstown line conversion, they are going to re-level the *platforms*, not the track, to allow level boarding, but this shouldn’t be required for the ECRL/Chatswood.
User avatar
GazzaOak
Posts: 885
Joined: Thu Mar 21, 2013 9:53 pm

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by GazzaOak »

Another thing as well, the government said its should take 7 months to convert the ECRL, but however the government also said to us that the bankstown line will take the same amount of the time to convert....

But since the ECRL is only fairly new and have 3 stations, shouldn't its take less time to convert than the bankstown line (since bankstown line is bloody complex with platform straitening, upgrading all station to have lifts/ticket barriers and whatever)
White ribbon day is most sexist thing ever
grog
Posts: 614
Joined: Wed Nov 07, 2007 8:09 am
Location: Sydney

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by grog »

There is no longer any platform straightening for the Bankstown line, it was removed from the scope to simplify the project and reduce the shutdown required. Instead there will be platform height adjustments during targeted station shutdowns (one at a time with the line remaining open) and mechanical gap fillers where required.