Sydney Metro - Tallawong to Bankstown

Sydney / New South Wales Transport Discussion
User avatar
rogf24
Posts: 1186
Joined: Thu May 09, 2013 4:20 pm

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by rogf24 »

But there's more trains south of Chatswood now. They just come from the ECRL instead of Gordon.
andy_centralcoast
Posts: 819
Joined: Tue Dec 30, 2014 8:22 pm
Location: NSW

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by andy_centralcoast »

7 news aired a story tonight showing testing of the new driverless trains for the North West
https://twitter.com/7NewsSydney/status/ ... 5718049794

They say it could be open for passengers within 12 months, before the next state election.
moa999
Posts: 2923
Joined: Fri Nov 23, 2012 3:12 pm

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by moa999 »

How much of the track is active?

And have they announced an actual closure date for Epping - Chatswood yet.. think last I had seen was still late 2018 for 6-7 months
User avatar
GazzaOak
Posts: 885
Joined: Thu Mar 21, 2013 9:53 pm

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by GazzaOak »

moa999 wrote:How much of the track is active?

And have they announced an actual closure date for Epping - Chatswood yet.. think last I had seen was still late 2018 for 6-7 months
I think they will start after Macquaire Uni finished at the end of the year. At least the first 2-3 months won't be as hugely disruptive if they start the closure after the uni finished
White ribbon day is most sexist thing ever
grog
Posts: 614
Joined: Wed Nov 07, 2007 8:09 am
Location: Sydney

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by grog »

But the channel 7 news story said it could be taking passengers in a year... that implies the shutdown would start in 4-5 months.
User avatar
Fleet Lists
Administrator
Posts: 23803
Joined: Sat Mar 06, 2004 12:49 pm
Location: The Shire

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by Fleet Lists »

Even 7 months could be very optimistic for the conversion to take place.
Living in the Shire.
grog
Posts: 614
Joined: Wed Nov 07, 2007 8:09 am
Location: Sydney

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by grog »

As far as I understand they need to install PSDs, separate the electrical supply from Sydney Trains, and then perform systems testing (signals etc.)

Most of the equipment installation for the signal system should have already taken place during possessions.
ed24
Posts: 118
Joined: Tue Jul 01, 2014 3:04 am

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by ed24 »

grog wrote:But the channel 7 news story said it could be taking passengers in a year... that implies the shutdown would start in 4-5 months.
I would be very surprised if they don't find a way to have it open before the state election in late March 2019
Transtopic
Posts: 1490
Joined: Fri Nov 25, 2011 10:10 pm

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by Transtopic »

ed24 wrote:
grog wrote:But the channel 7 news story said it could be taking passengers in a year... that implies the shutdown would start in 4-5 months.
I would be very surprised if they don't find a way to have it open before the state election in late March 2019
That was always the intention from my observation. But perhaps they're having second thoughts, because they're unsure about the public reaction, particularly with the disruption caused by the pending closure of the ECRL for conversion to metro.
User avatar
Daniel
Administrator
Posts: 7062
Joined: Mon Jul 04, 2005 9:03 pm
Favourite Vehicle: Mercedes-Benz O405 / CC '510'
Location: Sutherland Shire

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by Daniel »

September. The replacement bus fleet isn’t built yet.
tonyp
Posts: 12348
Joined: Tue Nov 28, 2006 2:31 am

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by tonyp »

Daniel wrote:September. The replacement bus fleet isn’t built yet.
Since they'll be replacing trains, they'll look something like this, right?

Image

Wouldn't want any inefficiencies slowing up such a large flow of people.

Or at the very least, this:
8342a.jpg
8342a.jpg (135 KiB) Viewed 3614 times
N series of course and TfNSW/RTBU lifting all-door loading ban in an unprecedented spirit of cooperation and moving into modern times.

Surprise me Daniel! :wink:
simonl
Posts: 8003
Joined: Mon Dec 29, 2008 8:03 pm
Location: Sydney, Australia

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by simonl »

Can't imagine the RTBU coming into it. They'll be private operators won't they?
iamthouth
Posts: 438
Joined: Sun Oct 24, 2010 5:38 pm

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by iamthouth »

No chance sorry tonyp, specs demanded were 12.5s, two door city buses.
andy_centralcoast
Posts: 819
Joined: Tue Dec 30, 2014 8:22 pm
Location: NSW

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by andy_centralcoast »

The ECRL temporary transport plan on the Sydney Metro website hasn't been updated since 2014. The website still says "Over the next few years, we will continue to refine the temporary transport plan."

However the community consultation said:
- 120 fully accessible air-conditioned buses will operate, with at least one bus every 10 minutes.
- A standard train fare will be charged on bus services used for the Epping to Chatswood line upgrade.
- A joint venture between Transdev NSW and Hillsbus will operate the Epping to Chatswood bus services.
- Road and intersection upgrades, including bus priority measures, will be completed before the upgrade begins.
- Customers from stations between Normanhurst and Cheltenham will be able to travel to the city without changing trains on the Northern Line via Strathfield.

In December 2017, Macquarie University told students that Transport for NSW had advised the precise date of the train station closure is likely to be made public in February.
tonyp
Posts: 12348
Joined: Tue Nov 28, 2006 2:31 am

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by tonyp »

What's going to happen to the majority of passengers who quite patently won't fit on the buses? Will they be driving?
User avatar
boronia
Posts: 21567
Joined: Sat Mar 06, 2004 6:18 am
Favourite Vehicle: Ahrens Fox; GMC PD4107
Location: Sydney NSW

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by boronia »

With the M2 just up the road, why not?
Preserving fire service history
@ The Museum of Fire.
Glen
Posts: 3365
Joined: Thu May 27, 2004 10:54 pm
Location: Sydney

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by Glen »

tonyp wrote:What's going to happen to the majority of passengers who quite patently won't fit on the buses?
How do you know they won't fit?
tonyp
Posts: 12348
Joined: Tue Nov 28, 2006 2:31 am

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by tonyp »

Glen wrote:
tonyp wrote:What's going to happen to the majority of passengers who quite patently won't fit on the buses?
How do you know they won't fit?
Maths. Will there be 20 x 12 metre buses replacing every train to provide the same capacity (at least in peaks)?
grog
Posts: 614
Joined: Wed Nov 07, 2007 8:09 am
Location: Sydney

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by grog »

Are you being tongue-in-cheek or are you expecting that every person who currently travels through the ECRL from the Upper Northern line to the CBD is going to follow the same geographical path and change from train to bus to train?
tonyp
Posts: 12348
Joined: Tue Nov 28, 2006 2:31 am

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by tonyp »

grog wrote:Are you being tongue-in-cheek or are you expecting that every person who currently travels through the ECRL from the Upper Northern line to the CBD is going to follow the same geographical path and change from train to bus to train?
No, I'm thinking of the strong two-way commuting that occurs on the section between Chatswood and Epping on its own - being a corridor that has major residential, university, retailing and business. That is, people who get on and off between Chatswood and Epping.
grog
Posts: 614
Joined: Wed Nov 07, 2007 8:09 am
Location: Sydney

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by grog »

But you would agree that this will not require 20 x 12m bus services per replaced train service, right?
tonyp
Posts: 12348
Joined: Tue Nov 28, 2006 2:31 am

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by tonyp »

grog wrote:But you would agree that this will not require 20 x 12m bus services per replaced train service, right?
Yes of course, as people will take alternative routes if they don't have to get on and off between Epping and Chatswooed, but still quite a number! I wouldn't rate acquisition of a fleet of two-door 12 metre buses as an adequate action plan.
ed24
Posts: 118
Joined: Tue Jul 01, 2014 3:04 am

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by ed24 »

Daniel wrote:September. The replacement bus fleet isn’t built yet.
They also have to finish the widening of Delhi Road.
grog
Posts: 614
Joined: Wed Nov 07, 2007 8:09 am
Location: Sydney

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by grog »

Daniel wrote:September. The replacement bus fleet isn’t built yet.
Good point. The Macquarie Park Bus Priority and Capacity Improvements stage 1 work started on Jan 15 and is scheduled for 36 weeks (http://www.rms.nsw.gov.au/documents/pro ... 017-11.pdf) which takes us to the middle of September, so looks pretty likely that this is the date.

7 months from mid-September is mid-March, so if they are looking to have it open around Feb, before the March 23 election, they must be betting on not needing a full 7 months.

Remember that there was talk of ECRL running as a shuttle for a few months before the shutdown, so this could happen in June/July - this could potentially when we see the next new timetable, which would more or less be the post-metro timetable.
Transtopic
Posts: 1490
Joined: Fri Nov 25, 2011 10:10 pm

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Post by Transtopic »

tonyp wrote:No, I'm thinking of the strong two-way commuting that occurs on the section between Chatswood and Epping on its own - being a corridor that has major residential, university, retailing and business. That is, people who get on and off between Chatswood and Epping.
Correct. What many people don't realise is that the maximum patronage flow to the Macquarie Park stations is actually in the contra-peak direction from the CBD and Lower North Shore, not from the Northern Line. That's why extra services were introduced in the morning and evening contra-peak direction between the CBD and Epping.

Existing commuters from Normanhurst to Cheltenham will still be able to travel directly to the CBD via Strathfield, without the need to change trains, contrary to some views expressed by those in denial, who still insist that you will have to catch three trains. They will not need the replacement bus services, unless they are travelling to Chatswood or any of the Macquarie Park stations in between, which I suggest would be the minority. Even those bound for North Sydney would be better off to stay on the train, as all indications so far are that they will continue through the CBD to the North Shore. They're not going to save any time by switching to the buses.

Where there could be a problem is for commuters bound for Macquarie Park by bus interchanging from St Leonards or Chatswood in the morning peak. I can remember when I used to drive to work to the Eastern Suburbs on Epping Road before the ECRL opened and buses in the contra-peak direction headed for Macquarie Park were jam packed. That was nearly a decade ago and with all of the development that's taken place since then, particularly with the opening of the ECRL, it's going to take a lot more buses than it did then, which will only exacerbate the current traffic congestion. I hope they've thought it through, otherwise it's going to be an unmitigated disaster and doesn't bode well for the Bankstown Line shutdown.