Brisbane Metro

Post by jonwil »

The latest version of the Metro seems to solve all the problems.
The plans involve one line between 8 Mile Plains and Roma Street and a second line between UQ Lakes and RBWH using bi-artic "banana" buses.
There is a plan to build a new underground station at Cultural Centre and to turn the Victoria Bridge into a bus-only bridge.

Heck, if they wanted to do something about the problem right now with only a relatively minor amount of investment, they could make the Victoria Bridge into a bus-only bridge, make Melbourne Street between the bridge and Grey Street bus-only and build an extra pair of platforms at Cultural Centre. That would double the bus capacity of both Cultural Centre and the Victoria Bridge and reduce the problems significantly.

Even doing the above bus-only bridge and road changes but without the extra platforms at Cultural Centre and having buses that go down surface streets use stops on Melbourne Street, Merivale Street etc would be a big improvement.

Ultimately I suspect there will be some political fighting over any plan to make the Victoria Bridge bus-only (the Labor council opposition have already said they dont support the idea)
tonyp
Posts: 12340
Joined: Tue Nov 28, 2006 2:31 am

Re: Cross River Rail Link

Post by tonyp »

jonwil wrote:The latest version of the Metro seems to solve all the problems.
If it's this you're referring to it won't solve a thing:

http://www.brisbanetimes.com.au/queensl ... .html?btis

I don't know the political structure of bus operation in Brisbane, but this sort of network planning and the selection of the appropriate mode should rest with the centralised authority of the state department of transport. Brisbane City Council don't seem to have a clue but they certainly give every appearance of being Australia's last enclave of rabid bus-boosters ("buses can do everything").

So it's called a metro (which conventionally means a rapid transit train) and yet the vehicles are described as "buses" by the Lord Mayor and they are "flexible" which presumably means you can miss the "vehicle" because it decided to go down another street on that day instead of past your usual stop. Sounds wonderful. You have such people responsible for your transit?

Gold Coast light rail is running at about 1/3 of its capacity at present according to the level of demand. It still has about 200% more capacity. The Brisbane busways claim of 18,000 people per hour has, in the meantime, been proven to be a furphy because it only refers to a section where several route come together with no stops. Any mode can achieve that with those parameters.

Will bi-articulated buses be allowed in Australia? On indications so far, no and in any case they don't provide any more capacity than a B or C1 class Melbourne tram, well short of what a 30 or 45 metre tram can carry. That leaves single-articulateds which in Australia can carry about 110. That would be good on the busway but I imagine overkill when the buses branch out to their various destinations. It would seem logical to adopt a Gold Coast or CSELR (Sydney) solution in which the higher capacity articulateds are confined to the busway along which there are interchanges to feeder routes using smaller buses. The unsustainable notion of a single journey for everybody is what creates that conga-line congestion we see in Brisbane. The operating costs of running so many little buses must also be horrendous.

I also read something about them expecting them to do 90 second headways. To do that they'd have to have multiple doors and all-door loading in the buses because you can can't exchange big crowds in buses like that just using the front door, especially in articulateds.

It all seems very amateurish and poorly thought-out, with a particular mode fixation rather than identifying the most suitable mode for the job.
simonl
Posts: 8003
Joined: Mon Dec 29, 2008 8:03 pm
Location: Sydney, Australia

Re: Cross River Rail Link

Post by simonl »

It's good news that the stupid idea that they took to the council election has been scrubbed. I don't expect anything much to come from this idea. For a start no stops in KGSBS or QSBS are suitable for bi-artics. Think that this idea is analagous to the NW Metro in Sydney. Both were never going to be built.

Regarding the headways, all door boarding isn't the only parameter. There is also multiple buses loading and/or unloading at the same time.

The amazing thing was that Anna Bligh refused council's offer to take over the buses when Campbell Newman was mayor. Wanted their money it seems.

Interchange with Moggill Rd? That isn't anywhere near the line on the map shown.
jonwil
Posts: 1003
Joined: Mon Mar 23, 2009 12:54 pm

Re: Cross River Rail Link

Post by jonwil »

tonyp wrote:So it's called a metro (which conventionally means a rapid transit train) and yet the vehicles are described as "buses" by the Lord Mayor and they are "flexible" which presumably means you can miss the "vehicle" because it decided to go down another street on that day instead of past your usual stop. Sounds wonderful. You have such people responsible for your transit?
I suspect "flexible" in this case means that it bends (as opposed to being rigid) rather than "flexible" in its route.
tonyp
Posts: 12340
Joined: Tue Nov 28, 2006 2:31 am

Re: Cross River Rail Link

Post by tonyp »

jonwil wrote: I suspect "flexible" in this case means that it bends (as opposed to being rigid) rather than "flexible" in its route.
Could be, a lot is rather ambiguous in the quirky (so to speak) press release! I do suspect though that he is referring to route because it's coupled to a remark about "not limited to set tracks" - as if to say that when things "grind to a halt" on the busway, the bus can abandon ship and do some rat-running through the back streets.

This is overshadowed though by the epic one-liner: "the Lord Mayor described the vehicles as buses"! Unreal. So a "metro" using "vehicles" that "can be described as buses". Who does he think he's fooling? The bloke should be hosting a comedy show, not running a city.
1of55
Posts: 190
Joined: Fri Feb 01, 2013 10:08 pm

Re: Cross River Rail Link

Post by 1of55 »

The Brisbane Busway system works very well, has a good safety record and the last thing Brisbane needs is the return of street railways (Trams) cluttering up the streets and the massive upheaval and disruption of years of construction like we had on the Gold Coast. A minor traffic incident and the whole system comes to a halt. The recent Adele concert at the Gabba proved the flexibility of Buses over trains and fixed route trams.

The points where the Busway comes unstuck are where it meets ordinary traffic, as in Melbourne Street and the City end of the Victoria Bridge.

The poor design of the Cultural Centre bus station is also a problem, a passenger waiting for a bus is never sure which of the 4 loading bays they will be boarding at, which often necessitates a sprint to the opposite end of the platform to board your bus before it departs. Hopefully the new proposed Cultural Centre bus interchange will address this.

The Queen Street bus station is another example of poor planning, where access to the 3 different platforms is scattered and hard to find if you are not familiar with the strange layout of the Meyer Centre. It all comes down to passenger flow, where the people going in one direction do not get in the way of the passenger flow in the opposite direction. Separate entrance and exits should be provided for passengers arriving and leaving the platforms.

The board at the front alight by the back door rule should be more rigorously enforced and only prepaid journeys accepted on the Busway. The bus is delayed by passengers putting $5 on their Go card and the issue of paper tickets. (While the driver explains that returns are no longer available.) This would speed up passenger loading and reduce bus time stationary at bus way platforms.

We also need better signage. A passenger who knows where they are going is quicker than a passenger lost and is a more satisfied traveller who will return to public transport.

Let’s hope we get it sorted before the Commonwealth Games!
tonyp
Posts: 12340
Joined: Tue Nov 28, 2006 2:31 am

Re: Cross River Rail Link

Post by tonyp »

1of55 wrote:The Brisbane Busway system works very well, has a good safety record and the last thing Brisbane needs is the return of street railways (Trams) cluttering up the streets and the massive upheaval and disruption of years of construction like we had on the Gold Coast. A minor traffic incident and the whole system comes to a halt. The recent Adele concert at the Gabba proved the flexibility of Buses over trains and fixed route trams.
Aren't buses on fixed routes too, otherwise nobody would know where to catch them? The busways are certainly fixed routes.

Out of interest, how many people were shifted by the buses at the end of the Adele concert and within what time period?

I wasn't suggesting replacing the busways with trams, merely that these decisions are best left with state transport agencies and that it might be better to run the busways as stand-alones operated with articulated buses, with interchange to feeder services run by rigid buses rather than having buses run through to their ultimate destinations. The problem is that Quirk was being disingenuous suggesting that it was some sort of "metro" and the proposition for double-articulated buses is probably not feasible in Australia and doesn't deliver that much more capacity in any case.

The biggest problem with the busways is that you have so many small buses on them that it leads to congestion. It's not relevant whether the congestion is in ordinary traffic or on the busway - the former spills over onto the latter because the latter delivers too many buses into the traffic. The other problem is the sheer cost of the busways, both capital and operating. The infrastructure is akin to that for heavy rail (indeed more expensive than most recent rail projects) but doesn't deliver the capacity of heavy rail. On top of this, then operating the busways with scores of small buses (with very many drivers) produces large operating costs. The 5 equivalent rigid buses that together match one Gold Coast tram in capacity require 4 more drivers than the tram and of course 4 more vehicles incurring WOL operating costs. No small matter to consider unless BCC is flush with money.

As for passenger flow (in at the front, out at the centre) it's generally proven that it doesn't work and in any case isn't possible in Australia as the ramp for mobility-restricted is generally at the front door. The only system that processes passengers quickly and distributes them more evenly through the vehicle is all-door loading like a train or tram.
1of55
Posts: 190
Joined: Fri Feb 01, 2013 10:08 pm

Re: Cross River Rail Link

Post by 1of55 »

Bus routes are flexible because they don't run on rails set in concrete. Bus routes had to be rerouted many times while the Gold Coast lightrail was being constructed. The advantage of the Brisbane bus ways is that the suburbs are served by local buses and travel speedily along the busway ( upto 90klm) avoiding the queues of cars on the expressway until they get to South Brisbane that is, where they meet cars traveling into the City, looking for somewhere to park. Logan City Bus service route 555 is a good example of a route which makes full use of the Busway and serves Logan City without the high cost of laying expensive tram tracks.
1of55
Posts: 190
Joined: Fri Feb 01, 2013 10:08 pm

Re: Cross River Rail Link

Post by 1of55 »

Passenger flow works fine on Transport for London with passengers entering the front door and exiting through the rear door, except at the terminus. Admittedly they have only one touch on point next to the driver and yes the disability loading ramp is in the middle (electrically operated). Prams and disability scooters would have to exit through the front door on Brisbane buses as they do now, but most passengers walk on and most of the time with no paper tickets and go card top ups, and waiting for passengers to get off at the front, loading would be much quicker.
tonyp
Posts: 12340
Joined: Tue Nov 28, 2006 2:31 am

Re: Cross River Rail Link

Post by tonyp »

1of55 wrote:Bus routes are flexible because they don't run on rails set in concrete. Bus routes had to be rerouted many times while the Gold Coast lightrail was being constructed. The advantage of the Brisbane bus ways is that the suburbs are served by local buses and travel speedily along the busway ( upto 90klm) avoiding the queues of cars on the expressway until they get to South Brisbane that is, where they meet cars traveling into the City, looking for somewhere to park. Logan City Bus service route 555 is a good example of a route which makes full use of the Busway and serves Logan City without the high cost of laying expensive tram tracks.
It'd be debatable which was more expensive to lay per km, tramway or many sections of the busways. An infrastructure Australia list I saw some years ago rated two of the Brisbane busways as the first and third most expensive public transport infrastructure projects in Australia, more than any railway except the Epping-Chatswood line in Sydney which came in second place (at least that one carries high-capacity trains), and certainly more expensive than any tramway to that time.

"Flexibility" is a two-edge sword. It really inconveniences and alienates your customers when you change the route on them. It's something you'd do as little as possible. Tram systems typically also have plenty of flexibility (either route diversions or switching tracks), it's just that Gold Coast is still a very basic single-route line with an operator lacking much operational sophistication as yet. It's a lazy solution just to call in the buses when something stops a tram but this isn't the way it's done across much of the world.

London Transport is not an operational exemplar in the bus world, in fact it would be one of the poorer ones. The most successful and productive bus systems in Europe use all-door loading and now it's catching on in USA:

https://nextcity.org/daily/entry/bus-ri ... r-boarding

So what I'm suggesting is a variant of Quirk's proposition - that the busways be generally self-contained core routes (like GCLR) using normal articulated buses with 3 double-leaf doors, preferably fully low floor to encourage even distribution of passengers, and with all-door loading, interchanging to rigid buses to suburban destinations further out. This way you should get a substantial capacity increase on the busways while reducing congestion.

By the way, my question again: how many people were shifted at the end of the Adele concert and in what time period? Anybody know?
1of55
Posts: 190
Joined: Fri Feb 01, 2013 10:08 pm

Re: Cross River Rail Link

Post by 1of55 »

So where is it proven that separate entrance and exit doors don’t work? Transport for London is well ahead on passengers carried over other transport systems. Hong Kong and Singapore also board at the front and very fast. Multiple entrances on buses would provide a situation like the trains where people have open access to platforms and fare evasion is rife.

60,000 people went to each Adele concert and according to ABC radio this morning those interviewed were satisfied with travel times.
tonyp
Posts: 12340
Joined: Tue Nov 28, 2006 2:31 am

Re: Cross River Rail Link

Post by tonyp »

1of55 wrote:So where is it proven that separate entrance and exit doors don’t work? Transport for London is well ahead on passengers carried over other transport systems. Hong Kong and Singapore also board at the front and very fast. Multiple entrances on buses would provide a situation like the trains where people have open access to platforms and fare evasion is rife.

60,000 people went to each Adele concert and according to ABC radio this morning those interviewed were satisfied with travel times.
Strict passenger flow does work, yes, but all-door passenger exchange is faster and distributes passengers through the bus far better, thus enabling full loading of the vehicle. It's all been researched and timed and is thus widely used in Europe. The article from USA covers all the issues and the Americans wouldn't be going for it if it wasn't proven by years of practice. They even used it in London on the artics but lost out to an internal ideological battle within TfL. They hang on to those double decker buses and their old ways pretty stubbornly there, but those who have the freedom to say it say the all-door loading worked much better while it lasted.

Thanks for the information on the Adele concert but I'm looking for detail, specifically how many of those went and left by public transport and how long it took to clear the crowd at the end.

Somebody on another forum has clarified for me that the proposal Quirk is talking about is pretty exactly what I've suggested - artics running the trunk route interchanging with feeder buses further out, same principle as GCLR. This is fine then (except for the environmental credentials!).

Edit: it's turning into comedy -

http://www.brisbanetimes.com.au/queensl ... .html?btis

If those two council clowns are so reluctant to use the word "bus" (and tell a complete untruth about the capacity of GCLR to boost their case for buses), doesn't it suggest that there's actually a problem with public perception of buses and their performance vis a vis trams and trains? If they were actually confident about what they're doing they would simply call it a bus and nobody would be concerned about it. Buses do have a lot going for them if they're designed and run properly but the local bus industry/lobby has an amazing proclivity for shooting itself in the foot time and again.
simonl
Posts: 8003
Joined: Mon Dec 29, 2008 8:03 pm
Location: Sydney, Australia

Re: Cross River Rail Link

Post by simonl »

Re: Adele, the 60k were moved in 90 minutes. So room for improvement.

Doubtless they persisted with the stupid idea that the Carindale services used the outbound platform at the busway station and single door boarding.
tonyp
Posts: 12340
Joined: Tue Nov 28, 2006 2:31 am

Re: Cross River Rail Link

Post by tonyp »

simonl wrote:Re: Adele, the 60k were moved in 90 minutes. So room for improvement.

Doubtless they persisted with the stupid idea that the Carindale services used the outbound platform at the busway station and single door boarding.
Thank you. So was that the full 60,000 exclusively by PT or did some come and go by car?
simonl
Posts: 8003
Joined: Mon Dec 29, 2008 8:03 pm
Location: Sydney, Australia

Re: Cross River Rail Link

Post by simonl »

The bulk would have used PT but some would have come by car.
tonyp
Posts: 12340
Joined: Tue Nov 28, 2006 2:31 am

Re: Cross River Rail Link

Post by tonyp »

simonl wrote:The bulk would have used PT but some would have come by car.
Yes I looked up the Gabba and it says it's basically a PT venue with quite a wide area of parking restrictions. 1.5 hours is a bit long and provides the clue that it is buses that are handling it and that it doesn't live up to the claims of their advocates. However, they still could do somewhat better than this with buses.
tonyp
Posts: 12340
Joined: Tue Nov 28, 2006 2:31 am

Re: Brisbane Metro

Post by tonyp »

https://www.busnews.com.au/industry-new ... -to-tender

I think an Australian bodybuilder could quite readily produce double-artics. I'm a bit disappointed that council is talking up imports unecessarily as though it's something special. It's only a bus, although the Mayor seems completely deluded and having grandiose fantasies about what it is. The project is basically Gold Coast light rail with less capacity and rubber tyres. It will be interesting to see if drivers can park these buses at a platform with the small and even clearance of a tram. I hope they know about Kassel kerbs.

In Europe, single-artics have a capacity of about 150, double-artics about 190-200. If somebody is talking about 250, they need a tram. All these figures need to take account of axle loads and Australian expectations of acceptable crowding, which would be typically no more than 4 ppsm.
tonyp
Posts: 12340
Joined: Tue Nov 28, 2006 2:31 am

Re: Brisbane Metro

Post by tonyp »

It seems that some of the people want trams:

https://groups.google.com/forum/#!topic ... fWvXwW2SdY
User avatar
1whoknows
Posts: 3983
Joined: Tue Mar 09, 2004 12:55 pm
Location: Melbourne

Re: Brisbane Metro

Post by 1whoknows »

Tram foamers who want to close the whole busway system down for a year or so whilst its converted to rail.....because that has worked sooooo well in Sydney hasn't it.
"Inside Every Progressive Is A Totalitarian Screaming To Get Out"
David Horowitz.
tonyp
Posts: 12340
Joined: Tue Nov 28, 2006 2:31 am

Re: Brisbane Metro

Post by tonyp »

1whoknows wrote:Tram foamers who want to close the whole busway system down for a year or so whilst its converted to rail.....because that has worked sooooo well in Sydney hasn't it.
Yes it will work well because it will restore the capacity that was lost when the original tram system was closed and replaced by buses!

I think Brisbane City Council is playing a risky, amateurish game with an uncertain outcome. Meanwhile the Gold Coast Light Rail, in a much smaller city, is going great guns. Odd that there's a higher-capacity trunk system in a smaller city and a lower-capacity one in a big city. I'm wondering why the State government can't move in and take over the BCC bus operation and place it under coordinated state-wide planning with proper expertise.

It's not a question of whether it's trams, buses or trains, but whether it has the most suitable mode that has the capacity to meet the present and future demand.
simonl
Posts: 8003
Joined: Mon Dec 29, 2008 8:03 pm
Location: Sydney, Australia

Re: Brisbane Metro

Post by simonl »

Wow. For I think the first time ever, I agree with 1whoknows. I don't know how anyone can argue that the most suitable mode for the CSELR was a tram. I suppose technically the CSELR hasn't opened yet so we don't know how it will turn out but still.

BTW, BCC has 1.45 people/hectare
Gold Coast, 4.44 people/hectare
tonyp
Posts: 12340
Joined: Tue Nov 28, 2006 2:31 am

Re: Brisbane Metro

Post by tonyp »

simonl wrote:Wow. For I think the first time ever, I agree with 1whoknows. I don't know how anyone can argue that the most suitable mode for the CSELR was a tram. I suppose technically the CSELR hasn't opened yet so we don't know how it will turn out but still.

BTW, BCC has 1.45 people/hectare
Gold Coast, 4.44 people/hectare
Oh come on, we've been all over the CSELR analysis over the years, not going to open the discussion again. Two reasons - capacity and blocking up the CBD entry with too many buses.

What's the population in the Brisbane busway catchment including its feeders vs what's the population in the GCLR catchment including its feeders?
simonl
Posts: 8003
Joined: Mon Dec 29, 2008 8:03 pm
Location: Sydney, Australia

Re: Brisbane Metro

Post by simonl »

You come on. As if a rational person would spend $1.6bn (original price tag) on a mode which falls short of the needed capacity and also is quite slow.

Anyway, have you been to the Gold Coast and seen the catchment vs the SE Busway catchment? I have. One has multi storey apartment blocks along it and one is low density for about 3/4 of its length and no prizes for guessing which is which.
verbatim9
Posts: 229
Joined: Tue Jun 12, 2018 12:20 pm

Re: Brisbane Metro

Post by verbatim9 »

Brisbanetimes --> Companies bid to build Brisbane Metro as land resumptions finalised
The owners of four properties in Brisbane south have willingly handed over their land to the council so it can build a depot for the $944 million Brisbane Metro project.

On Tuesday, Brisbane City Council approved the resumption of four private properties on School Road at Rochedale.

The council first issued the notices to resume to the owners on June 29, 2018, and no objections were received from the property owners.

Opposition leader Peter Cumming criticised the available information on the resumptions, saying there was very little detail.

“I feel there could have been much more information given,” he said.

Public and Active Transport chairman Adrian Schrinner said the council would now make a formal application to the state government to finalise the property acquisition.

“Sadly I can’t report that there has been any progress on the state government land that we need,” he said.

“But I hold hope that we will get there before too long.”

The state government owns a 4.5 hectare block of land at Rochedale needed for the depot as well as a 1600 square metre lot on Grey Street at South Brisbane needed to build the underground Cultural Centre station.

Cr Schrinner said the metro had progressed in other areas as well, with five different consortia putting in a proposal for the major infrastructure package, which would include the $315 million underground station at the Cultural Centre and a tunnel beneath Adelaide Street in Brisbane CBD.

Cr Schrinner said people would be very familiar with a lot of these companies.

“The key construction firms that we would expect to be putting in proposals on this major project have shown a great level of interest and based,” he said.

All of the submissions will now progress to the next stage, the request for proposal stage.

Cr Schrinner said once the formal tender process started h anticipated to shortlist during that process and then progress from there.

“The construction industry, the people who will partner with us to deliver this project are really showing us the highest level of interest so that’s a great outcome,” he said.
Consortia bidding to build Brisbane Metro:

Brisbane Move Consortium, comprising Acciona Construction Australia Pty Ltd and Arup Australia Projects Pty Ltd;

Lendlease consortium comprising, Lendlease Engineering Pty Ltd and WSP Australia Pty Ltd;

MetroConnect consortium, comprising Laing O’Rourke Australia Construction Pty Ltd, AECOM Australia Pty Ltd and Aurecon Australasia Pty Ltd;

METRO4BNE consortium, comprising CPB Contractors Pty Ltd, Seymour Whyte Constructions Pty Ltd, Vinci Construction Grand Projets SAS and SMEC Australia Pty Ltd; and

TransForm BNE consortium, comprising McConnell Dowell Constructors Pty Ltd, John Holland Pty Ltd and GHD Pty Ltd.

The $944 million Brisbane Metro will run over 21 kilometres with two new high-frequency, high-capacity lines, linking Eight Mile Plains to Roma Street and Royal Brisbane and Women's Hospital to the University of Queensland Lakes and all busway stations in between.
Westside
Posts: 112
Joined: Mon Jan 05, 2009 9:40 pm
Location: Somewhere in Canberra

Re: Brisbane Metro

Post by Westside »

I haven't read the plans in detail, but does anyone know if regular buses will still use the upgraded busway (even just in parts), or if the busway will become a banana bus-only right of way?
The good stuff is above!