Metronet costings

Perth / Western Australia Transport Discussion

Moderators: perthbus, Mr OC Benz

Post Reply
User avatar
TP1462
Posts: 1439
Joined: Sun Aug 07, 2011 3:43 pm
Favourite Vehicle: B7RLE, OC500LE, 0305, B10M.

Metronet costings

Post by TP1462 »

The West Australian has obtained a McGowan government document that has put the price of Metronet stage 1 up to $5.2 billion

$930 million for Automatic Train Control
$450 million to remove 6 level crossings on the Armadale/Thornlie (Cockburn) Line
C series railcar expansion
Thornlie & Yanchep extensions $622 million
Bellevue Link and Karnup station $264 million

Image



Sent from my iPhone using Tapatalk
tonyp
Posts: 12358
Joined: Tue Nov 28, 2006 2:31 am

Re: Metronet costings

Post by tonyp »

After becoming accustomed to the eyewatering costs of projects in NSW, this seems dirt cheap! Better value too than continuously extending motorways that undermine the public transport.
User avatar
TP1462
Posts: 1439
Joined: Sun Aug 07, 2011 3:43 pm
Favourite Vehicle: B7RLE, OC500LE, 0305, B10M.

Re: Metronet costings

Post by TP1462 »

tonyp wrote:After becoming accustomed to the eyewatering costs of projects in NSW, this seems dirt cheap! Better value too than continuously extending motorways that undermine the public transport.
Most of these are additional expenditure that labor didn’t account for prior to the election such as the removing the 6 level crossings on the Armadale/Thornlie (Mandurah) line between Vic Park & Beckenham for a total of 17 with stage 1 including the removal of 5 as part of the Byford extension, the C series railcar acquisition has been expanded, the Bellevue extension I believe also now accounts for the removal of the Archer street and Robinson road level crossings, the state government does have a road building agenda they’re not proceeding with roe stage 8 so they’ve had to proceed with a number of alternatives to try and calm congestion in South Metro there is at least 30+ road projects in metro Perth and regional WA which either relate to traffic flow enhancement such as grade separation or road widening some of which are necessary for these metronet projects to proceed, the Mitchell freeway is being extended from Hester Ave to Romeo Road planning and construction will be aligned as close to the Yanchep rail extension to reduce overall construction costs and improve road connectivity to the new stations, Tonkin highway is partially being upgraded to freeway standard from Ellenbrook to Southern River as well as widened over the Swan River and through Morley so the Ellenbrook spur line tunnel structures can be built, Tonkin highway is also being extended from Thomas road in Oakford through to South Western highway in Mundijong, a number of enhancements are being done to Reid highway to potentially cater for the future Ellenbrook rail link


Sent from my iPhone using Tapatalk
User avatar
TP1462
Posts: 1439
Joined: Sun Aug 07, 2011 3:43 pm
Favourite Vehicle: B7RLE, OC500LE, 0305, B10M.

Re: Metronet costings

Post by TP1462 »

Forgot to mention they’re also building a new freeway to Bunbury the outer ring road


Sent from my iPhone using Tapatalk
Post Reply

Return to “Discussion - Perth / WA”