Belconnen Redevelopment (January to March 2010)

Moderator: Busnerd

Forum rules
  • A topic icon must be used with the thread title of all threads.
  • No more than 10 photos per post with a maximum of 50 in any one page in a thread.
  • Maximum photo width 1000 pixels.
  • For full photo rules and how to attach photos see viewtopic.php?f=10&t=28459
  • Thank you :)
Post Reply
User avatar
Bus 400
Posts: 985
Joined: Tue Jul 03, 2007 4:23 pm
Location: Sydney

Belconnen Redevelopment (January to March 2010)

Post by Bus 400 »

January 2010
The work to be carried out in January was still the preparation work to extend Cohen Street past the Westfield expansion & through the old Belconnen Interchange site. The main thing was that the big wall at the western end of the Belconnen Interchange was knocked down & work has began near Emu Bank for Cohen Street to push through.

Image
Looking east towards Emu Bank from Chan Street overpass.
Image
Looking west towards Westfield Belconnen

Any new photos I take of the Belconnen Redevelopment can be found at http://s611.photobucket.com/albums/tt19 ... velopment/
User avatar
DarrenH
Posts: 3772
Joined: Mon Dec 19, 2005 9:17 pm
Location: Newcastle NSW

Re: Belconnen Redevelopment (January to March 2010)

Post by DarrenH »

I am trying to visualize what the old interchange looks like without the large concrete wall in place. The site is looking much different now and thanks for the update.
Post Reply

Return to “Photos - Canberra/ACT”