January 2010
The work to be carried out in January was still the preparation work to extend Cohen Street past the Westfield expansion & through the old Belconnen Interchange site. The main thing was that the big wall at the western end of the Belconnen Interchange was knocked down & work has began near Emu Bank for Cohen Street to push through.
Looking east towards Emu Bank from Chan Street overpass.
Looking west towards Westfield Belconnen
Any new photos I take of the Belconnen Redevelopment can be found at http://s611.photobucket.com/albums/tt19 ... velopment/
Belconnen Redevelopment (January to March 2010)
Moderator: Busnerd
Forum rules
- A topic icon must be used with the thread title of all threads.
- No more than 10 photos per post with a maximum of 50 in any one page in a thread.
- Maximum photo width 1000 pixels.
- For full photo rules and how to attach photos see viewtopic.php?f=10&t=28459
- Thank you
Re: Belconnen Redevelopment (January to March 2010)
I am trying to visualize what the old interchange looks like without the large concrete wall in place. The site is looking much different now and thanks for the update.