nathan1987
Posts: 211
Joined: Sun Apr 10, 2011 5:31 pm

Re: Wulkuraka Maintenance Centre

Post by nathan1987 »

What lines are the NGR currently servicing? I knew the Gold Coast was first. So many are being delivered but how many are in service and what lines.
1of55
Posts: 190
Joined: Fri Feb 01, 2013 10:08 pm

Re: Wulkuraka Maintenance Centre

Post by 1of55 »

NGR trains are currently in service on the Airport/ Gold Coast lines, Doomben line and Redcliffe and Springfield lines. The most numerous NGR trains are on the Gold Coast/ Airport lines. They all run through the central stations as all the lines pass through. The Doomben trains often terminate at Roma Street, but they are not all NGR. The Springfield and Redcliffe lines tend to run some NGR trains at morning and afternoon peaks and can terminate at Bowen Hills. EMUs and SMUs other times.
I do not have figures for the number in service; it is increasing all the time. The NGR trains also travel on the Ipswich/ Rosewood line as test trains to and from Wulkuraka Maintenance Centre.
701, 702 and a damaged 715 can be seen from Redbank Station.
User avatar
Swift
Posts: 13236
Joined: Sat Mar 06, 2004 1:23 pm
Favourite Vehicle: Porshe 911 Carerra
Location: Ettalong- the world capital of 0405s.

Re: Wulkuraka Maintenance Centre

Post by Swift »

Any particular reason Queensland chose narrow gauge instead of a wider system? They look like the sugar cane tracks to the north. I wonder what the gauge of Gold Coast Light Rail is. They look to be standard gauge.
QR Citytrain need to go dual gauge so as they can phase in standard gauge rolling stock in the future.
NSW, the state that embraces mediocrity.
1of55
Posts: 190
Joined: Fri Feb 01, 2013 10:08 pm

Re: Wulkuraka Maintenance Centre

Post by 1of55 »

Queensland choose 3’6” gauge when Australia was a country of separate colonies and joining of the separate rail systems was not contemplated, as the settlements were thousands of miles apart and the lines were constructed to ferry goods and produce to the ports. Narrow gauge was selected as it was cheaper to construct and the lines also followed the contours of the land and avoided tunnels and earthworks to lower costs. We do have dual gauge into the Port of Brisbane, Acacia Ridge and Roma Street for the interstate train to Sydney. I can’t see conversion to standard gauge of the entire system ever happening as the cost would be uneconomic, so that is why we have Bombardier NGR trains with narrow gauge bogies. On the new extensions the track is built much straighter and the narrower gauge is not a problem as the trains can safely travel at 140klm. The Gold Coast tram is 4’8½” gauge.
nathan1987
Posts: 211
Joined: Sun Apr 10, 2011 5:31 pm

Re: Wulkuraka Maintenance Centre

Post by nathan1987 »

1of55 wrote:NGR trains are currently in service on the Airport/ Gold Coast lines, Doomben line and Redcliffe and Springfield lines. The most numerous NGR trains are on the Gold Coast/ Airport lines. They all run through the central stations as all the lines pass through. The Doomben trains often terminate at Roma Street, but they are not all NGR. The Springfield and Redcliffe lines tend to run some NGR trains at morning and afternoon peaks and can terminate at Bowen Hills. EMUs and SMUs other times.
I do not have figures for the number in service; it is increasing all the time. The NGR trains also travel on the Ipswich/ Rosewood line as test trains to and from Wulkuraka Maintenance Centre.
701, 702 and a damaged 715 can be seen from Redbank Station.

Thanks for that, hopefully they will be on all line soon including the Sunshine Coast Line, because every time I am up there that particular Gympie North ICE service is always cancelled or delayed due to mechanical faults.
1of55
Posts: 190
Joined: Fri Feb 01, 2013 10:08 pm

Re: Wulkuraka Maintenance Centre

Post by 1of55 »

NGR 736 at Park Road ready to depart for Domben.
NGR 736 at Park Road ready to depart for Domben.
NGR736ParkRoad20Oct2018.JPG (291.82 KiB) Viewed 24874 times
NGR 736 at Park Road ready to depart for Domben. 737 also seen in service on Gold Coast line.
1of55
Posts: 190
Joined: Fri Feb 01, 2013 10:08 pm

Re: Wulkuraka Maintenance Centre

Post by 1of55 »

740 and 741 in service on GoldCoaast line.
User avatar
Swift
Posts: 13236
Joined: Sat Mar 06, 2004 1:23 pm
Favourite Vehicle: Porshe 911 Carerra
Location: Ettalong- the world capital of 0405s.

Re: Wulkuraka Maintenance Centre

Post by Swift »

Must confess, their aerodynamic noses have grown on me. I just hope their interiors reflect their futuristic looks on the the outside and their doors open and shut fast in the traditional way. :)
NSW, the state that embraces mediocrity.
1of55
Posts: 190
Joined: Fri Feb 01, 2013 10:08 pm

Re: Wulkuraka Maintenance Centre

Post by 1of55 »

NGR trains have been in service on the Ipswich- Caboolture line since Oct 22. Here is NGR 738 at Ipswich station 29 Nov. The trains get switched around between lines seen NGR 738 Saturday on the Gold Coast line.
All the NGR trains I ve seen in service have 1 on board toilet, situated mid train. As we are now over half way into the total order of 75 trains, and an earlier announcement was made * that only the Interurban fleet—35 trains with 2 toilet modules (in the middle 2 cars) for longer distance services be fitted with an on board toilet and Suburban fleet—40 trains with no toilets for shorter distance services would be in service with no toilet, I assume that some are to be modified post delivery and the removed parts used for spares.
* https://www.tmr.qld.gov.au/Projects/Nam ... NGR-trains
Attachments
NGR738Ipswich29Nov2018.JPG
NGR738Ipswich29Nov2018.JPG (266.6 KiB) Viewed 22538 times
1of55
Posts: 190
Joined: Fri Feb 01, 2013 10:08 pm

Re: Wulkuraka Maintenance Centre

Post by 1of55 »

NGR 702 has gone from Redbank but 701 and 715 remain.
Attachments
NGR701715Redbank7dec2918.JPG
NGR701715Redbank7dec2918.JPG (227.56 KiB) Viewed 22183 times
1of55
Posts: 190
Joined: Fri Feb 01, 2013 10:08 pm

Re: Wulkuraka Maintenance Centre

Post by 1of55 »

interior shot of NGR 747 at Ipswich. NGR 748 also seen in service on Gold Coast line.
Attachments
NGR747Ipswich10jan2019.JPG
NGR747Ipswich10jan2019.JPG (261.16 KiB) Viewed 21210 times
1of55
Posts: 190
Joined: Fri Feb 01, 2013 10:08 pm

Re: Wulkuraka Maintenance Centre

Post by 1of55 »

NGR 701 has arrived back at the WMC towed behind diesel locos from Redbank.
1of55
Posts: 190
Joined: Fri Feb 01, 2013 10:08 pm

Re: Wulkuraka Maintenance Centre

Post by 1of55 »

NGR 715 (the damaged train) has gone from Redbank.
1of55
Posts: 190
Joined: Fri Feb 01, 2013 10:08 pm

Re: Wulkuraka Maintenance Centre

Post by 1of55 »

NGR 728 doing test train runs on the wrong road past the WMC. The line carries a lot of traffic, coal trains, some wheat trains and a passenger service. Some times the tracks have to be used in either direction. NGR 758 has been seen in test runs so they are well into the order for 75 6 car units.
Attachments
NGR728testrun2342019.JPG
NGR728testrun2342019.JPG (281 KiB) Viewed 17862 times
1of55
Posts: 190
Joined: Fri Feb 01, 2013 10:08 pm

Re: Wulkuraka Maintenance Centre

Post by 1of55 »

NGR 761 and 762 have just arrived at WMC coupled together behind 2 QR diesels.
1of55
Posts: 190
Joined: Fri Feb 01, 2013 10:08 pm

Re: Wulkuraka Maintenance Centre

Post by 1of55 »

NGR 756 seen in service on Gold Coast line. NGR 702 is in decorative wrap like 704, 705, 706, and doing test train runs. NGR 701 has been at Maryborough for modifications since late January.
User avatar
Swift
Posts: 13236
Joined: Sat Mar 06, 2004 1:23 pm
Favourite Vehicle: Porshe 911 Carerra
Location: Ettalong- the world capital of 0405s.

Re: Wulkuraka Maintenance Centre

Post by Swift »

Definitely growing on me this new QR Citytrain stock :lol: . I really admire the quick shutting doors. Can you imagine NSW adopting such a common sense idea? We are only now re-adopting the radical idea that single decks work better for high turnover work. :roll:
NSW, the state that embraces mediocrity.
1of55
Posts: 190
Joined: Fri Feb 01, 2013 10:08 pm

Re: Wulkuraka Maintenance Centre

Post by 1of55 »

NGR 763 and NGR 764 have arrived today at the WMC coupled together behind diesel locos. NGR 758 seen in service.
1of55
Posts: 190
Joined: Fri Feb 01, 2013 10:08 pm

Re: Wulkuraka Maintenance Centre

Post by 1of55 »

NGR702 one of the early deliveries and at Progress rail sidings for a while, now with decorative wrap like 704, 705, 706, going at slow speed through the automatic train inspection building at WMC.
Attachments
NGR702wulk16062019.JPG
NGR702wulk16062019.JPG (240.51 KiB) Viewed 15286 times
User avatar
Swift
Posts: 13236
Joined: Sat Mar 06, 2004 1:23 pm
Favourite Vehicle: Porshe 911 Carerra
Location: Ettalong- the world capital of 0405s.

Re: Wulkuraka Maintenance Centre

Post by Swift »

Aboriginal art plastered on transport is so cliche now. Can't we come up with a different cringey fad now?
NSW, the state that embraces mediocrity.
Cazza
Posts: 310
Joined: Thu Jan 31, 2019 6:26 pm
Location: Brisbane

Re: Wulkuraka Maintenance Centre

Post by Cazza »

To their credit, they didn't cover the windows in the wrap so I don't really have a problem with it. And I do think it looks kinda funky and as it's only been applied to a few of the sets, it's fairly unique. But I can see what you mean.
User avatar
Swift
Posts: 13236
Joined: Sat Mar 06, 2004 1:23 pm
Favourite Vehicle: Porshe 911 Carerra
Location: Ettalong- the world capital of 0405s.

Re: Wulkuraka Maintenance Centre

Post by Swift »

It looks XXX. Good to see NSW isn't the only place with mediocrity like this.
NSW, the state that embraces mediocrity.
1of55
Posts: 190
Joined: Fri Feb 01, 2013 10:08 pm

Re: Wulkuraka Maintenance Centre

Post by 1of55 »

Interior view of NGR 766 in service. NGR 768 seen on test runs.
Attachments
NGR766RomaSt211Aug2019.JPG
NGR766RomaSt211Aug2019.JPG (269.59 KiB) Viewed 13104 times
User avatar
Swift
Posts: 13236
Joined: Sat Mar 06, 2004 1:23 pm
Favourite Vehicle: Porshe 911 Carerra
Location: Ettalong- the world capital of 0405s.

Re: Wulkuraka Maintenance Centre

Post by Swift »

NSW, notice the absence of stairs going up or down?
You need to follow this standard.
NSW, the state that embraces mediocrity.
1of55
Posts: 190
Joined: Fri Feb 01, 2013 10:08 pm

Re: Wulkuraka Maintenance Centre

Post by 1of55 »

EMU 20 entering the Wulkuraka Maintenance Centre.
Attachments
EMU20abouttoenterWMC20Aug2019.JPG
EMU20abouttoenterWMC20Aug2019.JPG (268.31 KiB) Viewed 12537 times