NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Sydney / New South Wales Transport Discussion

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Postby quaidy » Sat Dec 23, 2017 7:34 am

By far the biggest perceived benefit of the metro as it will stand for the govt is its favorable cost recovery when it opens, and lack of ongoing drain on the treasury purses.


Sent from my iPhone using Tapatalk
User avatar
quaidy
 
Posts: 99
Joined: Tue Nov 14, 2006 8:55 pm
Has thanked: 15 times
Been thanked: 16 times

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Postby tonyp » Sat Dec 23, 2017 7:46 am

quaidy wrote:By far the biggest perceived benefit of the metro as it will stand for the govt is its favorable cost recovery when it opens, and lack of ongoing drain on the treasury purses.

Phrasing it that way makes it sound like it's the only real benefit. The extension of this statement is that it will be highly cost-effective, delivering far greater capacity per dollar spent and faster trips, meaning (apart from greater passenger satisfaction), smaller rolling stock requirement due to faster turnaround.
Perpetually on a T3 to "I. P. Pavlova, přestup na Metro. Příští zastávka, Náměsti Míru"
User avatar
tonyp
 
Posts: 6583
Joined: Tue Nov 28, 2006 1:31 am
Location: Shoalhaven
Has thanked: 471 times
Been thanked: 700 times

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Postby Fleet Lists » Sat Dec 23, 2017 8:18 am

tonyp wrote: (apart from greater passenger satisfaction),.

No proof of this as yet.
Living in the Shire.
User avatar
Fleet Lists
Administrator
 
Posts: 19547
Joined: Sat Mar 06, 2004 11:49 am
Location: The Shire
Has thanked: 941 times
Been thanked: 998 times

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Postby simonl » Sat Dec 23, 2017 8:37 am

quaidy wrote:By far the biggest perceived benefit of the metro as it will stand for the govt is its favorable cost recovery when it opens, and lack of ongoing drain on the treasury purses.

Nor of this, BTW.

Also, focusing on Metro takes the focus off reducing the operating cost of Sydney Trains (*sigh*), which will remain the majority of the network.
simonl
 
Posts: 7880
Joined: Mon Dec 29, 2008 7:03 pm
Location: Sydney, Australia
Has thanked: 834 times
Been thanked: 357 times

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Postby flitter » Sat Dec 23, 2017 11:55 am

Perhaps it is time to split this thread between the ‘principle’ of metros and future rail plan, and the Sydney Metro build and operation...


Sent from my iPad using Tapatalk
flitter
 
Posts: 45
Joined: Wed Nov 25, 2009 12:38 pm
Has thanked: 15 times
Been thanked: 5 times

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Postby Tonymercury » Sat Dec 23, 2017 4:25 pm

I think that's about five years too late - and the posters aren't disciplined enough to make it work.
Tonymercury
 
Posts: 2350
Joined: Sun Aug 14, 2005 3:14 pm
Location: Botany NSW
Has thanked: 193 times
Been thanked: 291 times

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Postby simonl » Tue Jan 02, 2018 1:16 pm

Any bets on whether the ECRL shutdown will be delayed until after the election like the George St closure was?
simonl
 
Posts: 7880
Joined: Mon Dec 29, 2008 7:03 pm
Location: Sydney, Australia
Has thanked: 834 times
Been thanked: 357 times

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Postby flitter » Tue Jan 02, 2018 5:08 pm

Aren’t they supposed to be finished and open by the election?
flitter
 
Posts: 45
Joined: Wed Nov 25, 2009 12:38 pm
Has thanked: 15 times
Been thanked: 5 times

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Postby simonl » Tue Jan 02, 2018 5:32 pm

This website says "first half of 2018" https://www.sydneymetro.info/station/epping-chatswood

It would have to get the earlier part of that target to achieve that. Also, I'm not convinced that would be good for the government because it would show that some of the pain is permanent.
simonl
 
Posts: 7880
Joined: Mon Dec 29, 2008 7:03 pm
Location: Sydney, Australia
Has thanked: 834 times
Been thanked: 357 times

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Postby Fleet Lists » Tue Jan 02, 2018 6:07 pm

Quoting from that link
From late 2018, buses will replace trains for around seven months between Epping and Chatswood whilst the line is converted to metro operations. When Sydney’s metro services start in the first half of 2019, 15 trains an hour will run in both directions between Epping and Chatswood during the peak – almost four times the number of trains running in the peak direction today. For example, a customer at North Ryde travelling towards Chatswood in the morning peak will see a metro train every four minutes in the peak, compared with the train every 15 minutes they get today.


Seven months from late 2018 would take them past the election date.
Living in the Shire.
User avatar
Fleet Lists
Administrator
 
Posts: 19547
Joined: Sat Mar 06, 2004 11:49 am
Location: The Shire
Has thanked: 941 times
Been thanked: 998 times

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Postby Transtopic » Tue Jan 02, 2018 6:19 pm

If they were so confident about the success and acceptance of the metro, you'd think they would want it running BEFORE the election. A little touch of doubt perhaps in delaying it? As far as I can recall, it was always planned to open in early 2019 before the election.
Transtopic
 
Posts: 569
Joined: Fri Nov 25, 2011 9:10 pm
Has thanked: 141 times
Been thanked: 100 times

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Postby Stu » Tue Jan 02, 2018 7:59 pm

First half of 2019 = calendar year or financial year?
Stu
 
Posts: 3561
Joined: Tue Aug 25, 2009 5:37 pm
Has thanked: 100 times
Been thanked: 389 times

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Postby simonl » Tue Jan 02, 2018 8:01 pm

Surely calendar.
simonl
 
Posts: 7880
Joined: Mon Dec 29, 2008 7:03 pm
Location: Sydney, Australia
Has thanked: 834 times
Been thanked: 357 times

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Postby Frosty » Tue Jan 02, 2018 9:31 pm

Thinking of North West Metro & the state election in 2019 maybe it will probably open after it but surely before the 2019 Federal Election which in a similar time. Who knows they may even want to co-ordinate the SELR opening with the North-West metro opening.
Frosty
 
Posts: 1397
Joined: Sat Jun 27, 2015 7:16 pm
Has thanked: 16 times
Been thanked: 81 times

Re: NSW Future Rail Plan - NWRL/Metro/Harbour Crossing

Postby Tonymercury » Wed Jan 03, 2018 12:16 pm

Chatswood to Sydenham construction site preparation at Sydenham.

On the Up side of the railway between St Peters and Sydenham, from the Bedwin Road overbridge back to the stormwater storage, fencing has started to appear around the whole site which will, I think, eventually be the Sydenham storage yard.

The TBMs require a vast stockpile of tunnel lining segments before they start digging. The storage for the concrete has already appeared and work may be on the verge of starting, certainly site preparation is well underway.
Tonymercury
 
Posts: 2350
Joined: Sun Aug 14, 2005 3:14 pm
Location: Botany NSW
Has thanked: 193 times
Been thanked: 291 times